Do you have any questions? We are ready to help
info@legitpapershub.com
Chat online
My Account

  • Home
  • Blog
  • Why Us
  • Contact Us
  • Services
Join
Order Now

  • Home
  • Blog
  • Why Us
  • Contact Us
  • Services
Join
Order Now
  • Home
  • Blog
  • Why Us
  • Contact Us
  • Services

Banking system

The purpose of the individual system analysis and design project is to demonstrate student’s ability to apply the knowledge learned in this course to a realworld project.
Project Deliverables
The project requires students to perform three phases: (a) requirements analysis, (b) system and database design, and (c) a project plan. Note that in the
phase 3, students are required to use the MS Project software for their project schedule.
The deadline for the Individual Project can be found in the schedule section of the class syllabus.
The following layout format covering a title page and all three phases is recommended for the project.
Title page (project name, author, and date)
Phase 1: Requirement analysis
A. Problem definition
B. Issues
C. Objectives
D. Requirements
E. Constraints
F. Descriiption of the proposed system
G. Logical model design
1. Data flow diagrams
• Context diagram
• Diagram 0
o Diagram 1 (Diagram 1 is optional)
• Descriiptions of processes in each diagram
2. Descriiptions of outputs/inputs/performance/security or controls
H. Specific requirements, if any (interface, operational, resource, performance, etc.)
Phase 2: System and database design
A. User interface
Design an overall user interface consisting of screens, commands, controls, and features to enable users to use the system.
1. How data will be input to the system?
• The physical layout for each input
• The input design and procedures
2. How data will be output from the system?
• The physical layout for each output
• The output design and procedures
B. Data design
Develop a plan for data organization, storage, updating, and retrieval.
1. Database design
• Database tables with their attributes should be presented
• Primary key(s) should be identified in each table, if any
• Three steps of normalization should be included.
2. Entity-relationship diagrams
3. Data file storage and access
C. System architecture
Determine the architecture of the system as Web-based interface, client/server architecture, Internet/Intranet interface, network configuration, etc.
Phase 3: Project plan
A list of tasks or activities needed for implementing the proposed system
Estimating completion time and costs
A project schedule for performing those activities (Gantt charts or PERT charts)
Note that there is no other required software package except the MS Project software in this ITEC-630 course. As a result, you are only required to use the
MS Project software to handle the scheduling part of the project and for other parts, you can use any word editing software or any drawing tools software

Sample Solutions

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Phasellus hendrerit. Pellentesque aliquet nibh nec urna. In nisi neque, aliquet vel, dapibus id, mattis vel, nisi. Sed pretium, ligula sollicitudin laoreet viverra, tortor libero sodales leo, eget blandit nunc tortor eu nibh. Nullam mollis. Ut justo. Suspendisse potenti.

Get sample solution

Order Now

Sed egestas, ante et vulputate volutpat, eros pede semper est, vitae luctus metus libero eu augue. Morbi purus libero, faucibus adipiscing, commodo quis, gravida id, est. Sed lectus. Praesent elementum hendrerit tortor. Sed semper lorem at felis. Vestibulum volutpat, lacus a ultrices sagittis, mi neque euismod dui, eu pulvinar nunc sapien ornare nisl. Phasellus pede arcu, dapibus eu, fermentum et, dapibus sed, urna.

Morbi interdum mollis sapien. Sed ac risus. Phasellus lacinia, magna a ullamcorper laoreet, lectus arcu pulvinar risus, vitae facilisis libero dolor a purus. Sed vel lacus. Mauris nibh felis, adipiscing varius, adipiscing in, lacinia vel, tellus. Suspendisse ac urna. Etiam pellentesque mauris ut lectus. Nunc tellus ante, mattis eget, gravida vitae, ultricies ac, leo. Integer leo pede, ornare a, lacinia eu, vulputate vel, nisl.

Suspendisse mauris. Fusce accumsan mollis eros. Pellentesque a diam sit amet mi ullamcorper vehicula. Integer adipiscing risus a sem. Nullam quis massa sit amet nibh viverra malesuada. Nunc sem lacus, accumsan quis, faucibus non, congue vel, arcu. Ut scelerisque hendrerit tellus. Integer sagittis. Vivamus a mauris eget arcu gravida tristique. Nunc iaculis mi in ante. Vivamus imperdiet nibh feugiat est.

Ut convallis, sem sit amet interdum consectetuer, odio augue aliquam leo, nec dapibus tortor nibh sed augue. Integer eu magna sit amet metus fermentum posuere. Morbi sit amet nulla sed dolor elementum imperdiet. Quisque fermentum. Cum sociis natoque penatibus et magnis xdis parturient montes, nascetur ridiculus mus. Pellentesque adipiscing eros ut libero. Ut condimentum mi vel tellus. Suspendisse laoreet. Fusce ut est sed dolor gravida convallis. Morbi vitae ante. Vivamus ultrices luctus nunc. Suspendisse et dolor. Etiam dignissim. Proin malesuada adipiscing lacus. Donec metus. Curabitur gravida

Share

What we also cover

Assignment writing Services

Essay writing Services

Thesis writing Services

Research Paper Services

Dissertation Services

PhD writing Services

Write My Paper
Manage Orders

Ready to order legit papers

Write My Paper

About Us

We are a solution for students. Students need to do well in school. They need to understand what they are taught and have this reflect in their grades.

Our Services

• Essay Writing Service
• Coursework Writing Service
• Report Writing
• Dissertation Writing Service
• Assignment Writing Service

 

• Essay Writing Service
• Coursework Writing Service
• Report Writing
• Dissertation Writing Service
• Assignment Writing Service

 

• Essay Writing Service
• Coursework Writing Service
• Report Writing
• Dissertation Writing Service
• Assignment Writing Service

We Accept

Contact Us

info@legitpapershub.com
support@legitpapershub.com

© 2021 legitpapershub.com. All Rights Reserved.
      WhatsApp us